The Trust was honoured to have New Zealand Prime Minister Rt Hon Jacinda Ardern launch a new book, ‘Hillary’s Antarctica’, at an event in the New Zealand Parliament Grand Hall in late October.
“Like seeing Antarctica for the first time” is how Lizzie Meek (Programme Manager – Artefacts) described her experience at Stonington Island on the Antarctic Peninsula.
Antarctic Heritage Trust has finished the last major job of saving Sir Edmund Hillary’s hut at Scott Base – installing a new roof.
The Trust raised nearly a million dollars to save the hut, also known as the TAE/IGY Hut, which was built by a team under Sir Ed’s leadership in 1957 just before his famous dash to the South Pole.
While working to conserve Hillary’s (TAE) Hut in 2016, the need for a weather-tight long-term roofing solution was identified.
Programme Manager Al Fastier says the Trust wanted the roofing solution to last a minimum of 35 years but more likely 50 to 100 years. A plan was then developed to overclad the historic roof, meaning the original roof remained intact.
A key feature of the newly restored hut is the painted aluminium roof, complete with new battens painted in the original bright orange.
“It gives it a real point of difference,” says Fastier, a long time visitor to the ice.
Antarctic Heritage Trust
Assembling the battens for the roof
For specialist Standing Seam roofer, Mike Burgess, the conditions provided a job unlike anything he had ever tackled.
“I’ve never been that cold,” says Burgess, who had to race indoors on the odd occasion to regain feeling in his hands.
The project manager for Architectural Metalformers is used to working through complicated roofing projects in rural, commercial and urban environments – less so in the world’s harshest environment.
“The opportunity to waterproof such an important New Zealand building with our product, while endeavouring to make it visually similar to the original aesthetic could not be passed up, regardless of the weather complexities,” Burgess says.
Not one to opt out of a challenge, Burgess combined his more than 20 years in the business, with further research, to come up with the robust long term waterproof roofing solution.
The Trust acknowledges, Architectural Metalformers, Pacific Coilcoaters, Sika NZ, Nexus Foams and Dulux New Zealand for their donated products and technical assistance.
Antarctic Heritage Trust
Chris Ansin, Al Fastier and Geoff Cooper taking a break on the roof of the hut.
Antarctic Heritage Trust
Antarctic Programme Manager Al Fastier working on the roof
https://nzaht.org/wp-content/uploads/2019/03/team-in-front-of-cab5ab95759486609.15283195-600x600-1.jpg600600Commshttps://nzaht.org/wp-content/uploads/2019/03/logo-dark.pngComms2018-03-27 01:33:232019-06-09 04:51:28Raising the Roof
The Trust raised nearly a million dollars to save the hut, also known as the TAE/IGY Hut, which was built by a team under Sir Ed’s leadership in 1957 just before his famous dash to the South Pole. The fundraising campaign included a 2012-kilometre tractor journey from Piha Beach to Mount Cook, collecting donations on the way.
Assembling the battens for the roof
The team are now thrilled to have completed conservation work on an iconic piece of Kiwi history.
New Zealand Antarctic Heritage Trust programme manager Al Fastier says it’s been a long and successful road to save the hut and conserve the hundreds of artefacts within it.
“As a historic site, its significance is that it’s the birthplace of New Zealand’s presence in Antarctica and the link to Sir Ed’s famous tractor trip to the South Pole.”
Antarctic Heritage Trust
Antarctic Programme Manager Al Fastier working on the roof
New Zealand Antarctic Heritage Trust programme manager Al Fastier says it’s been a long and successful road to save the hut and conserve the hundreds of artefacts within it.
“As a historic site, its significance is that it’s the birthplace of New Zealand’s presence in Antarctica and the link to Sir Ed’s famous tractor trip to the South Pole.”
While working to conserve Hillary’s Hut last season, the need for a weather-tight long-term roofing solution was identified.
Fastier says the Trust wanted the roofing solution to last a minimum of 35 years but more likely 50 to 100 years. A plan was then developed to overclad the historic roof, meaning the original roof remained intact.
Antarctic Heritage Trust
Antarctic Youth Ambassador Chris Ansin working on the hut roof
A key feature of the newly restored hut is the painted aluminium roof, complete with new battens painted in the original bright orange.
“It gives it a real point of difference,” says Fastier, a long time visitor to the ice.
For Fastier, there was an even greater connection to the restoration effort, New Zealand and Hillary, given he slept in the hut on his first trip to the ice in 1987.
Antarctic Heritage Trust
Chris Ansin, Al Fastier and Geoff Cooper taking a break on the roof of the hut.
As if the project itself did not provide enough of a challenge, the team had to work around extreme weather systems that included snow and wind storms.
Temperatures averaged -8 to 15 degrees Celsius during the project, with a few -25 and -30 degree Celsius days thrown into the mix.
For specialist Standing Seam roofer, Mike Burgess, the conditions provided a job unlike anything he had ever tackled.
“I’ve never been that cold,” says Burgess, who had to race indoors on the odd occasion to regain feeling in his hands.
The project manager for Architectural Metalformers is used to working through complicated roofing projects in rural, commercial and urban environments in and around Auckland – and less so in the world’s harshest environment.
When he was granted the opportunity to join the conservation effort, Burgess did not hesitate to accept.
“The opportunity to waterproof such an important New Zealand building with our product, while endeavouring to make it visually similar to the original aesthetic could not be passed up, regardless of the weather complexities,” Burgess says.
Not one to opt out of a challenge, Burgess combined his more than 20 years in the business, with further research, to come up with the robust long term waterproof roofing solution.
Burgess and Architectural Metalformers offered their time free of charge.
Having now returned from the ice, Burgess remains under the Antarctic spell.
“It’s been an experience that I will never forget, images and my words certainly don’t do it justice” he says.
“The scale, beauty and the history of the Antarctic – I’ve been bitten by the bug.”
Burgess and the Trust would also like to thank Pacific Coilcoaters, Sika NZ and Nexus Foams for their donated products and technical assistance.
https://nzaht.org/wp-content/uploads/2019/03/assembling-the-batto5a397c30f21cf5.34686210-1500x.jpg8421500Commshttps://nzaht.org/wp-content/uploads/2019/03/logo-dark.pngComms2017-12-19 22:04:482019-04-30 02:31:40Final Touches go on Sir Ed’s Antarctic Hut
New Zealand Antarctic Heritage Trust has discovered an almost perfectly preserved 118 year old watercolour painting among penguin-excrement, dust and mould covered papers found in an historic hut at Cape Adare, Antarctica.
https://nzaht.org/wp-content/uploads/2018/09/the-water-colour-pai593efc0c14ec73.21611806-785x.jpg593785Commshttps://nzaht.org/wp-content/uploads/2019/03/logo-dark.pngComms2017-06-12 23:43:152025-04-04 15:00:52Dr Edward Wilson Watercolour
We are delighted to have won the International category of the 31st annual Dulux Colour Awards for Hillary’s Hut. Sixty years on from when Hillary’s (TAE/IGY) Hut was the first building at New Zealand’s Scott Base, its retro colours are again shining bright… In the whitest white of an Antarctic snow storm, finding shelter fast can be the difference between life and death. In 1957, the intense orange and yellow of Sir Edmund Hillary’s Hut at New Zealand’s Scott Base was a beacon to those caught out by the weather.
Hillary’s hut
Hillary’s Hut, also known as the TAE/IGY Hut, was the first building erected at Scott Base. It was only recently returned to those original colours and last night won the International category ofthe 31st annual Dulux Colour Awards in Melbourne. Antarctic Heritage Trust Executive Director Nigel Watson says they’re delighted. “The award celebrates an iconic site and is recognition of the extreme lengths we went to, with Dulux, to recreate the original paintwork. This started with the careful stripping of the outer paint layers to reveal the original Berger colours and then working with Dulux to create an exact match.” The Trust’s team had the honour of naming the exterior colours mixed to match the originals:
Pram Point –the yellow is named after the geographic location of Scott Base
Sno-cat –after the orange tracked vehicles used on the Trans-Antarctic Expedition
The painting was undertaken as part of the Antarctic Heritage Trust’s conservation of Hillary’s Hut. Almost 600 artefacts were also conserved with the work completed in time for Scott Base’s 60th anniversary in January of this year.The Trust’s Programme Manager Al Fastier says the restoration was an enormous undertaking. “Painting in sub-zero conditions was a major challenge, with wind chill or storm conditions often making it impossible to work outside. With persistence and cold fingers, the team achieved a remarkable transformation -even using brushes rather than rollers to replicate a 1950’s finish.” Sir Edmund Hillary led the establishment of Scott Base and ‘wintered over’ in the hut as part of New Zealand’s involvement with the Commonwealth Trans-Antarctic Expedition and the International Geophysical Year. The hut was repainted green, along with the rest of Scott Base, in 1965/66. Nigel Watson says returning Hillary’s Hut to its original retro colours not only reflects its history, it makes a visible statement. “The bright, retro colours mean Hillary’s Hut stands out among the almost exclusively modern, green-painted buildings of Scott Base, drawing attention to its unique standing as the birthplace of Scott Base”. In addition to the exterior, the five main spaces inside the hut –mess room, radio room, Sir Ed’s room, the kitchen and cold porch –were all repainted in a multitude of colours, as specified on the original architectural plans. The Dulux Colour Awards are Australasia’s premier showcase of inspirational colour application in built environments
https://nzaht.org/wp-content/uploads/2019/03/hillarys-hut-859152d76ec8f62.07066524-600x600.jpg600600Commshttps://nzaht.org/wp-content/uploads/2019/03/logo-dark.pngComms2017-05-12 23:54:342021-12-08 09:25:55Hillary’s Hut Wins Award
On Friday 20 January 2017 the residents of New Zealand’s Scott Base celebrated the base’s 60 year anniversary by taking a tour through the recently restored Hillary’s (TAE/IGY) Hut.
Antarctic Heritage Trust’s team of 12 worked more than 5700 hours on the major conservation of the building over the summer season. The work started in November 2016 following a successful fundraising campaign to save the site, the legacy of the Commonwealth Trans- Antarctic Expedition (1956-1958).
Jane Ussher
A stunning photo taken by renowned New Zealand photographer Jane Ussher following the completion of the TAE Hut restoration.
The New Zealand Government and Antarctica New Zealand asked the Trust to take on the care and conservation of the hut, including raising funds for its restoration and long term maintenance.
“It’s an iconic slice both of polar and Kiwi history that could have been lost. Now, thanks to our many supporters from around the world it will be there to inspire future generations to explore and push their boundaries like Sir Ed did,” says the Trust’s Executive Director Nigel Watson.
Extensive planning and research was undertaken by the Trust in preparation for the conservation work. Originally designed to last only twenty years, after sixty years the building had a number of issues including deteriorating asbestos wall and ceiling linings, a leaking roof, snow ingress, and melt water under the foundations.
Care was taken to retain and reinstate original building materials after the asbestos was removed. Where new material was essential, modern material was chosen that was as close as possible to the original finish and appearance.
The 1980’s pitched roof addition was removed and the original flat roof structure was reinstated. Exterior vents and flues were repaired and replaced. The Trust worked closely with Dulux New Zealand to match original TAE-era paint samples and colour swatches, before repainting the exterior and interior of the building in the bold shades of the 1950s.
Hillary’s Hut featuring its original colours, renamed by the Trust as ‘Pram Point (yellow) and ‘Sno-cat’ (orange).
https://nzaht.org/wp-content/uploads/2019/03/a-magnificent-view5887fc63243485.03633235-600x600.jpg600600Commshttps://nzaht.org/wp-content/uploads/2019/03/logo-dark.pngComms2017-03-19 01:11:442019-04-30 09:53:17Saving Hillary’s Hut